Post-Migration Tasks
If you encountered problems during the migration and need to recover from any failures, review the topic Recovering from Migration Failures before proceeding with post-migration activities.
Complete the Migration
After all VENs have been migrated to the Illumio SaaS PCE, complete the following cleanup and decommissioning steps:
Retire the on-prem PCE.
Remove API keys that were generated specifically for the migration.
Remove any unnecessary or unmanaged workloads from the Illumio SaaS PCE.
Use this checklist to verify that the migration to the SaaS PCE is complete.
Category | Required Status | Action |
|---|---|---|
Unmanaged workloads | Unmanaged workloads have been removed. | Run the |
On-premise PCE | On-prem PCE has been properly decommissioned | Retire the on-prem PCE after all VENs are migrated. |
API keys | Migration-related API keys are no longer in use | Delete API keys generated during the migration. |
SaaS workloads | Unnecessary workloads are removed from SaaS | Remove unnecessary unmanaged workloads from Illumio SaaS. |